PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Embeds material at (2nd Floor) Facing North  (800x600).jpg Installed electrical conduit at 3rd Floor Facing South (600x800).jpg Welded embed at pour stops around 2nd floor Facing North (800x600).jpg Welding couplers at pour stops around the 3rd floor Facing West (800x600).jpg Continued prepping for the slab on grade Facing South-East (1) (800x600).jpg Continued welding the roof beams Facing South (800x600).jpg Installed electrical at 4th Floor Facing South (600x800).jpg View of Stair -2 Roof (800x600).jpg
Previous pageNext page Welding couplers at pour stops around the 3rd floor Facing West (800x600)
Welding couplers at pour stops around the 3rd floor Facing West (800x600)